Dubai Metro – Blue Line

The Project

The Dubai Metro Blue Line is a major 30 km expansion project that will connect the existing Red and Green lines.

The Blue Line consists of two main routes serving 14 stations (nine elevated and five underground). Route 1 (21 km) and Route 2 (9 km).

Our Appointment

East West Consulting Group was commissioned for quantity take-off and Bill of Quantities (BOQ) preparation. This includes detailed quantity take-off sheets/logs with all calculations and references to drawings and a formal, finalized Bill of Quantities document.

The Benefit

East West Consulting Group ensured that quantities are calculated accurately, which minimized the risk of costly errors, material waste, or budget overruns later in the project.